2025

Mesballe Energy Park

System data

Mesballe Energy Park – 14 MW

In 2024, SolarFuture and Energicenter Nord entered into a partnership to develop several solar parks over the coming years.

The first project was the establishment of Mesballe Energy Park, where SolarFuture was responsible for the construction and grid connection of a 14 MW solar PV plant built on Djursland. The solar PV plant consists of 23,946 pcs. 575 W bifacial LONGi modules and 38 pcs. 300 kW Huawei inverters connected to two transformer stations.

The solar park is located in an industrial area with close access to the local power grid. This results in minimal energy transmission losses from generation to the grid.